The FAT (Factory Acceptance Test) is performed at the DMI's facility under supervision of the client. The object of this test is to check the compliance of the equipment with the client's design specifications prior shipping.

The SAT (Site Acceptance Test) is performed at the client's site after commissionning. The object of this test is to check that the equipment fulfills all the  specifications of the contract. At the end of the SAT, the client will be provided with an IQ-OQ allowing the client to prove the conformity of his operations. At the end of the SAT, the client will be provided with a document containing all the elements required to validate the IQ-OQ, including the proof of the client's staff's (operators and maintenance) training.

Dehydrators

Process flow sheet

Dehydrators

1- Principle

1- Principle 1- Principle
DMI dehydrator processes the waste on site, directly connected from the harvesting area, without necessary intermediary storage, and transforms a liquid waste into a safe, clean, and easily transportable...
Read More...

3- Process in 4 steps

3- Process in 4 steps
Loading, Treatment cycle, Unloading, Output...
Read More...

4- Commissionning

4- Commissionning
  The commissioning is done by DMI's teams. As most of the elements supplied by DMI are skid-packaged, the commissioning is easy and very time-efficient (the machine will be made operationnal in...
Read More...

5- Standards / Testing

5- Standards / Testing
The FAT (Factory Acceptance Test) is performed at the DMI's facility under supervision of the client. The object of this test is to check the compliance of the equipment with the client's design specifications...
Read More...

6- Transportation

6- Transportation 6- Transportation
Oversea shipping is done through means of open top containers and trucks.   
Read More...

7- Technical data

7- Technical data
For vaccine growth medium.
Read More...