7- Technical data

For vaccine growth medium.

Dehydrator AV500L Dehydrator AV1500L Dehydrator AV3000L Dehydrator AV6000L
 Capacity    
Processed volume per batch (liters)  500 1700   3800 6800 
Estimated number of processed eggs par batch (eggs) 10000   30000  75000  130000
Time per batch (hours)  5 to 7  10 to 14  12 to 15  12 to 17
Time to download after process (minutes)  10  15  15  20
Temperature of the entire product during dehydration

> 80°C

4 hours

> 80°C

4 hours

> 80°C

6 hours

> 80°C

6 hours

Humidity rate of the product after processing     around 20% of humidity
Utilities     
Installed electrical power (KW):  8  20  30  42
Estimated electrical power used during cycle (KWH)  4  10  18  25

Installed natural gas
or propane (KW)

 50  630  630  630

Estimated fuel (gas or diesel) used per hour
during cycle (KWH)

 35  160  200  210

Water supply

1 bar

1/2 ' pipe

1 bar

3/4 ' pipe

1 bar

3/4 ' pipe

1 bar

3/4 ' pipe

Compressed air  6 bars 0.8m3/H  6 bars 0.8m3/H  6 bars 1m3/H  6 bars 1m3/H
 Size     
 Length (meters)  3.50  5.50  7.25   9.65
 Width (meters)  1.35  1.75  2.02  2.02
 Higher height (meters)  1.90  3.30  3.35  3.35
 Total weight (empty, metric tons)  3  8  11  17
 Possibility for airlight system between loading side and unloading side of dehydrator yes    

This table includes indicative data only and can not be set as contact. Data may vary.

Dehydrators

Process flow sheet

Dehydrators

1- Principle

1- Principle 1- Principle
DMI dehydrator processes the waste on site, directly connected from the harvesting area, without necessary intermediary storage, and transforms a liquid waste into a safe, clean, and easily transportable...
Read More...

3- Process in 4 steps

3- Process in 4 steps
Loading, Treatment cycle, Unloading, Output...
Read More...

4- Commissionning

4- Commissionning
  The commissioning is done by DMI's teams. As most of the elements supplied by DMI are skid-packaged, the commissioning is easy and very time-efficient (the machine will be made operationnal in...
Read More...

5- Standards / Testing

5- Standards / Testing
The FAT (Factory Acceptance Test) is performed at the DMI's facility under supervision of the client. The object of this test is to check the compliance of the equipment with the client's design specifications...
Read More...

6- Transportation

6- Transportation 6- Transportation
Oversea shipping is done through means of open top containers and trucks.   
Read More...

7- Technical data

7- Technical data
For vaccine growth medium.
Read More...

Optional equipments