The FAT (Factory Acceptance Test) is performed at the DMI's facility under supervision of the client. The object of this test is to check the compliance of the equipment with the client's design specifications prior shipping.

The SAT (Site Acceptance Test) is performed at the client's site after commissionning. The object of this test is to check that the equipment fulfills all the specifications of the contract. At the end of the SAT, the client will be provided with an IQ-OQ allowing the client to prove the conformity of his operations. At the end of the SAT, the client will be provided with a document containing all the elements required to validate the IQ-OQ, including the proof of the client's staff's (operators and maintenance) training.

 

  • Capacity


  • Processed volume per batch

    Estimated number of processed eggs per batch
    Time per batch
    Time to download after process
  • Dehydrator AV500L
  • 500 liters

    10000 eggs
    5 to 7 hours
    10 minutes
  • Dehydrator AV1500L
  • 1700 liters

    30000 eggs
    10 to 14 hours
    15 minutes
  • Dehydrator AV300OL
  • 3800 liters

    75000 eggs
    12 to 15 hours
    15 minutes
  • Dehydrator AV6000L
  • 6800 liters

    130000 eggs
    12 to 17 hours
    20 minutes